01
Choose the orientation
Decide whether the broad face, slim edge or a three-quarter
view should be directed towards the principal viewing area.
02
Excavate
Prepare a suitable opening for the 90cm reservoir, allowing
additional depth for the structural foundation below.
03
Create the concrete base
Form a firm, level concrete pad beneath the reservoir and
allow it to cure before continuing.
04
Position the reservoir
Install the 90cm diameter reservoir securely and level on the
prepared foundation.
05
Add internal supports
Position suitable brick supports inside the reservoir beneath
the intended stone position and build them to the underside
of the support grid.
06
Install pump & pipework
Position the supplied pump within the reservoir and connect
the required pipework to the pre-drilled stone.
07
Fit the galvanised grid
Position the supplied steel grid securely so it is correctly
supported by the reservoir and brick supports below.
08
Position No. 159
Carefully position the monolith over the supported area and
confirm its final orientation before finishing.
09
Finish & fill
Conceal the grid with decorative pebbles, retain pump access,
fill the reservoir and start the recirculating water system.