01
Choose the position
Decide which copper-grey face should be directed towards the
main viewing position before beginning excavation.
02
Excavate
Prepare a suitable opening for the 90cm reservoir, allowing
additional depth for the structural base beneath it.
03
Create the concrete base
Form a firm, level foundation beneath the reservoir and allow
it to cure before continuing with the installation.
04
Position the reservoir
Install the 90cm pebble pool securely and level on the prepared base.
05
Add internal supports
Build suitable brick supports inside the reservoir beneath
the intended stone position up to the underside of the grid.
06
Install pump & pipework
Position the supplied pump within the reservoir where it can
remain accessible and connect the required pipework to the stone.
07
Fit the galvanised grid
Position the supplied steel grid securely so it is correctly
supported by the reservoir and structural supports beneath.
08
Position No. 166
Carefully lift and position the monolith over the supported
section of grid with its preferred face correctly orientated.
09
Finish & fill
Conceal the grid with decorative pebbles, retain pump access,
fill the reservoir and start the recirculating water system.